Brand New House / Lawn

IMG_4020IMG_4027IMG_4028IMG_4029IMG_4031IMG_4032IMG_4033IMG_4034

Project Info

This job was done mid winter during the time there was regular heavy rain.

We had to import and spread 20m² of top soil with limited access. We were lucky to have 1.5 fine days to get the job done.

Once the top soil was spread and leveled, down went the green carpet for an instant transformation.

Before/After / HOVER

IMG_4020
IMG_4027